
Point Hudson, 17-FEB-2026 – The last post should have been two parts. It ran on forever. I’m sorry. This is part two. We can mourn the fact that it is not part three. That would have made everything easier to read.
I finally finished the project by removing the wires from the shunt to a bus block. I also removed the mass of negative wires from the negative terminal to an existing bus block. Fusing is the reason why the positive was moved to a new block, and the negative was moved to an exisitng one.
Continue reading “Electric Lights, Not City Lights, Part 2”